ZARZĄD INWESTYCJI
SP. Z O.O.
ZIK INVESTMENT MANAGEMENT LTD OFFERS THE FOLLOWING SERVICES
• Performing the function of Replacement Investor / Project Manager
• Wide-range investment supervision from preparation for realization till the actual realization of investments.
• Participation in the selection process of construction company, drafting the contract document.
• Preparation of documentation of projects and cost estimates for investments.
• Provision of all officially required opinions, conditions, decisions and permissions which are necessary to draw up documentation.
THE SCOPE OF OUR SERVICES INCLUDES THE FOLLOWING
1. Preparation and obtaining of a „Decision on Construction Terms and Site Planning”.
2. Carrying out examinations and studies on geotechnical conditions for planned investment.
3. Preparation of a „Report on the Planned Investment's Impact on the Environment” and obtaining appropriate decision.
4. Obtaining the optimal conditions of electricity, water, gas, rain water, sewage supply for the planned investment.
5. Preparation of technical specification which determine further designing and realization process.
6. Providing Investor’s Supervision services, including work of Construction, Electrical and Sanitary Inspectors (inspections performed by our team when required)
7. On-site Representation of the Investor, monitoring of construction and its accordance with Project Design, Building permit, Building Law and Polish Norms and Technical Knowledge.
8. Quality check of works, built-in materials, with prevention of use of faulty or non-certified building materials.
9. Checking and acceptance of building works which will be covered or build-up, participation in technical tests and approvals of installations, buildings, structures etc.
10. Confirming and approving physically completed works and eliminated faults.
11. Informing the Investor about faults and unplanned situations.
12. Official confirmation of the supervision and approvals in the site log.
13. Status reports preparation.
14. Review of invoices considering merit, financial and formal aspects submitted by contractors.
15. Searching for technical solutions at the design and realization phase to ensure the minimal costs of realization at each stage, maintaining comparable material standards.
We are ready to discuss all details of possible cooperation during direct meeting with the Client. As the design phase has already been completed our services will apply only to the realization phase.
Realization time of the services offered by our company is based on Investor’s requirements and is strictly connected with the necessary phases of the investment and building process. ZIK Investment Management Ltd. will adjust the time-frames of its services to investor’s requirements.
Our remuneration fee depends on the value of the investment and is estimated as an outcome of mutual negotiations. On the basis obtained data we estimate the cost of monthly supervision at 14.500 net per month.
OUR MAIN PROJECTS
Public Facilities:
• Hospitals
• Schools: High School, Primary Schools
• Banks
• Municipal Heating Plants
• Swimming Pools
• Sports Facilities: Sports Gyms, Sports Stadiums
• Sewage Treatment Plants
RECENT PROJECTS
DESIGN PHASE:
production halls and building complex for:
• German Investor – Fresenius Kabi Polska
• German Investor: WOCO Polska
• German Investor: BRUCK Polska
• Italian Investor: SIRMAX Polska – 3 stages
• American Inwestor - Little Baseball League
• Czech Investor: Kofola Polska
• Polish Investor: Nobilus Ent
• Polish Investor – Bakoma Nova
• Danish Investor – Konskilde Polska Sp. z o.o.
• Italian Inwestor – K-Flex Sp. z o.o.
• Israeli Investor – TEVA Kutno S.A.
• roads in Kutno, Płock, Piątek, Łęczyca, Daszyna, Dąbrowice etc.
• bridges on the river Moszczenica and Struga in Gmina Piątek and many other projects
• Italian Investor – Serioplast Poland Sp. Z o.o.
• Polish Investor – ECO Opolszczyzna – heating plant 6MWe
INVESTEMENT SUPERVISION PHASE:
• building of a Chemical Plant „Nobilus Ent” in Kutno,
• rebuilding of a production plant for „Ekogal” S.A. in Kutno,
• building of Little League Baseball facilities in Kutno,
• building of a heating plant and a greenhouse for „Plantico” S.A. in Kutno,
• modernization of an actively working plant for Bakoma Nova in Kutno, with involvement of substantial financial means granted by European Union,
• conversion and extension of a large-surface factory for a German Company „Elaplast GmbH” Limited Liability Co. And WOCO GmbH,
• building of factory houses and a warehouse for a pharmaceutical company Fresenius Kabi,
• building of a chemical plastics factory for an Italian investor Sirmax Polska – 3 stages,
• building of a food industry factory for a Czech investor Kofola Polska,
• building of a steam heating plant running on gas heating for „Bakoma Nova” in Kutno,
• building of a powdered milk production line for „Bakoma Nova” in Kutno,
• building of a sports hall in Lucień and in Mazewo,
• buildnig of a multifunctional houses for a Community Constructions Association in Łęczyca and in Kutno,
• building of a heating network in Kutno,
• building of Public Schools in Witonia and Gostynin,
• building of gas pipeline in Piotrków Trybunalski, Kutno, Zgierz, Tuszyn, etc.,
• building of a number of roads, for e.g. in Dąbrowice Commune and in Nowe Ostrowy.
• building of production hall for German Investor PAJA Folie Sp. z o.o.
• building for TEVA Kutno Sp. z o.o.
• building of production halls for Danish investor – Kongskilde
• building of production plant for Spanish investor – Enginova
• building of production plant for Italian investor – Serioplast
• building of heating plant 6MWe for Polish investor – ECO Opolszczyzna
PROJECTS WITHIN ŁÓDŹ SPECIAL ECONOMIC ZONE – KUTNO SUBZONE
PROJECT DESIGN/PROJECT MANAGEMENT/ INVESTMENT SUPERVISION
KOFOLA – production plant
PAJA FOLIE – production plant
KELLOGG – production plant – in progress (concept phase)
K-FLEX – production plant – in progress
SIRMAX POLSKA – production plant with office building, 2 warehouses – completed
KONGSKILDE – two production halls including one with office building – completed
ENGINOVA – production hall, office building, technical buildings – completed
SERIOPLAST – production hall, office building, technical buildings – in progress
ECO – heating plant 6MWe – in progress